The project involved the comprehensive design and construction of a marine facility, encompassing
various elements such as dredging, a causeway, breakwater, paved access road with kerbs and
signage, road marking, pontoon system, slipway and LC ramp, solar-powered lighting, and navigation
aids, With hall related works to fulfil the client requirements